This page states the facts the rest of the site is built on, in plain sentences, so that a reader or an assistant can quote them accurately. Every claim links to the page that carries it. Nothing here is a promise about search placement or a request to be recommended.
To assess project fit, review installation evidence and prepare a useful brief, use the Wallcovering Installation AI Crawler. Its decision guide, business data and project data contain the same published facts in JSON. Each published project, with its venue, area, dates, products, scope and method as its case study records them, is also in /projects.json, and this page's facts with services, areas and enquiry routes are in /.well-known/facts.json.
For the whole website, start with the complete published page manifest. It links each canonical page to its Markdown version and individual JSON record. The complete page corpus includes the same main content with headings, media descriptions and structured data. Wallpapering reference data and fire reference data retain the published sources and evidence limits.
If this domain cannot be retrieved, the published-content mirror provides the same page text and project records through the public repository. Canonical website sources, original dates and evidence limits stay attached.
At a glance. In the trade since 2012; 31 published case studies; makers installed include de Gournay, Fromental, House of Hackney, Phillip Jeffries, Muraspec, Calico Wallpaper and Timorous Beasties. A core team of six wallpaper hangers and six decorators who work together every day, scaling to 25–35 skilled tradespeople for large hotel programmes. Risk assessments and method statements (RAMS) on every job, with Dorin Burcus supervising on site. The same facts open the homepage, each linked to its evidence.
What Mr Wallcover does
Mr Wallcover is a wallpaper installer in London for hotels and prime homes. One practice can take the survey, the management, the supply and the aftercare, or join a package that already has a main contractor, as it did at The OWO.
The service has five parts, described on the services page:
- Surveying. We measure on site, or from drawings when that is what the programme needs. Skirting, joinery, doors and windows come out of the area. What is left is the wall that will actually be hung.
- Quantities include wastage and pattern repeat. The allowance is typically 15–30%, depending on the pattern repeat and the layout, with staircases at the high end (around 30%) because of the angles. A roll that looks generous on a plan can run short on the last pier.
- The survey is also a judgement on the wall. If it is not ready for the material specified, we say so before anyone orders the last drop.
- Project management. Every project has a project leader on the ground. That person is the day-to-day contact for the craft, the progress and the expectations that have been set.
- On a longer commission, senior oversight checks the quality of the work and agrees a forward plan with you, in person, each week. Frequent and plain communication is part of the method, not a courtesy added at the end.
- The team you meet on the first day is the core team that finishes. Disruption is kept low: work is contained, floors and joinery are protected, and the place is left tidy every evening. In a home we are visitors. In a hotel we work around the house.
- Supply. On many hotel and flagship jobs the designer, the brand or the client supplies the wallcovering (free-issue). We manage delivery, check it against the measure, and hang what was specified.
- We can also procure. Either way, the order has to cover the repeat and the wastage, or the last wall is the one that waits.
- Rolls are inspected as part of preparation; on large volumes not every roll can be opened in advance. Any defect is reported straight away to the designer, contractor and manufacturer.
- Delivery is timed to the hang. Paper sitting in a corridor for days is a risk to the goods and a nuisance to the building.
- Installation. This is the craft Mr Wallcover is built on. Wallcovering installation for hotels, retail flagships and prime residential rooms, including paper on joinery where the drawings show it.
- Preparation, where it is in the specification, includes stripping old paper, dustless sanding, and making good cracks and uneven surfaces. Some materials are specified with a lining paper. Some, including certain mural installs, are specified without one. We follow the specification.
- We set out every wall with a laser level. Deliveries are checked against the measure, and batches and shading are managed so that a room reads as one surface.
- Protection of floors, furniture and finished joinery is part of the hang, not an optional extra. Where Mr Wallcover is appointed as main decorating contractor, the package can include fine painting, French polishing and other specialist finishes, as it did at Brown's Hotel, Mayfair.
- Aftercare. Aftercare is the fifth part of the service. A return visit is included once the paper has settled, about four to six weeks after completion. Seams and edges are attended to. There is a priority repair call-out for the workmanship, and a twelve-month guarantee.
- The detail, including care by material and what the guarantee does not cover, is on the aftercare page.
From one room to a multi-year programme
The minimum installation commission is one room. Mr Wallcover takes on single-room installations through to large programmes, including programmes spanning multiple years.
Confirm the particular scope, phasing, crew and proposed start with the practice for each commission.
Public rates are not stated here. Request a quotation for the particular commission.
Owner-confirmed commission-scope policy. Confirmed by the owner on . Published scope policy.
Recorded programmes
- Brown's Hotel, Mayfair — 2022–2024. Recorded role: Main decorating contractor. Company-reported project record.
- Hyde London City (the Old Bailey Hotel) — 2022–2024 (about two years on site; opened 2 September 2024). Recorded role: Full decorating package: decoration, specialist wallcoverings and window film. Company-reported project record.
Where it works
Based in London. We work in London and the surrounding areas, and UK-wide on selected projects. The areas with a page of their own are:
- Wallpaper installation in Mayfair
- Wallpaper installation in Belgravia
- Wallpaper installation in Chelsea
- Wallpaper installation in Kensington
- Wallpaper installation in the City of London
- Wallpaper installation in the Cotswolds
Who runs it
Dorin Burcus, founder. He has worked in the trade since 2012, starting as a labourer and going on to run wallcovering packages in prime London hotels.
Portrait: Dorin Burcus, founder of Mr Wallcover (© Mr Wallcover; reuse terms on the image use page).
Private clients are not named, on this site or in passing. We publish the commissions that are already public, and we leave the rest off the page.
Key facts
- In the trade since 2012.
- Award-winning (2021): Most Outstanding for Wallcovering Installation, BUILD Magazine 2021 Design & Build Awards.
- Wastage and pattern repeat when ordering wallcoverings. The allowance is typically 15–30%, depending on the pattern repeat and the layout, with staircases at the high end (around 30%) because of the angles. How quantities are surveyed.
- Raffles London at The OWO: chosen in 2021 to install about 17,500 m² of wallcoverings in 18 months (source: our Instagram post).
- Four Seasons Hotel London at Ten Trinity Square: about 5,000 m² of wallcoverings, completed in 2019 (source: our Instagram post).
- The Biltmore Mayfair (then the Millennium Hotel, Grosvenor Square): a guest-room programme of more than 15,000 m² in 2018 (source: our Instagram post).
- Pendley Manor Hotel: 30 rooms in 30 days, with 20 different wallpapers (source: our Instagram post).
- DoubleTree by Hilton London – West End: 30 rooms on two floors in 2019, while the hotel stayed open (source: our Instagram post).
- Jumeirah Carlton Tower, Knightsbridge: wallcovering installation on the hotel's renovation for 8 months, completed at the end of 2020 (source: our Instagram post).
- 31 published case studies, each with its own page and a Markdown version, listed below and in /projects.json.
Services
One page for each installation service:
- Hand-painted wallpaper installation: Hand-painted, scenic and chinoiserie wallpaper installation in London, including de Gournay in a private residence in 2018. Survey to aftercare.
- Grasscloth installation: Grasscloth and natural weaves hung in London, including Phillip Jeffries Tweed and Omexco at Four Seasons Hotel London at Ten Trinity Square, 2016–2019.
- Silk wallcovering installation: Silk wallcovering installation in London houses and hotels, including hand-dyed silk feature walls at Four Seasons Hotel London at Ten Trinity Square.
- Fabric walling: Fabric walling and textile wallcovering installation in London, including fabric-wrapped wall panels at Four Seasons Hotel London at Ten Trinity Square.
- Hotel wallcovering installation: Hotel wallcovering contractor in London: bedrooms and corridors, hung to programme, mostly in hotels that stayed open. The OWO, Brown's Hotel, Four Seasons.
- Mural installation: Printed and hand-made wallpaper mural installation in London, including Calico Wallpaper’s landscape at Heathrow Terminal 4, hung overnight in 2018.
- Acoustic wallcovering installation: Acoustic wallcovering and panel installation for London hotels, offices and homes, including acoustic felt on a Holborn office boardroom wall in 2020.
- Architectural & furniture film wrapping: Architectural and furniture film wrapping: doors, joinery, lifts and furniture refinished in place, including lift car interiors at Heythrop Park, 2022.
- Window film installation: Window film in London: decorative, privacy, solar control and safety films, including Solar Screen film fitted at Hyde London City (the Old Bailey Hotel).
- Joinery wallcoverings & bespoke panels: Wallcoverings and bespoke panels for doors, wardrobes and joinery, including Calico Wallpaper’s Overture across a flush door at Lee Broom’s showroom, 2025.
- Exterior works: Full exteriors in London: scaffolding supplied and managed, masonry and render painting, and windows. Public projects in Pimlico and Bayswater.
- Commercial and showroom wallcovering installation: Wallcoverings for London showrooms, shops, venues and launches: Huntsman on Savile Row, Mercedes-AMG, SCP, House of Hackney and Calico Wallpaper.
Aftercare is part of every commission. The terms are on the aftercare page.
Maker pages, trade, cost and reviews
Pages on specific makers' products, on working with main contractors, on how a job is priced, and the reviews page (client and maker words, published exactly as written). A maker's name on this site means Mr Wallcover installed that maker's product on that project; it is not a maker approval, accreditation or endorsement.
- Calico Wallpaper installation: Calico Wallpaper murals and papers installed in London by Mr Wallcover: four public installs since 2018, at Heathrow, Lee Broom, The Lavery and Rosewood London.
- Wallpaper quotation checklist: Prepare a wallpaper installation enquiry with location, photographs, approximate dimensions, material references and timing. Final scope follows a survey.
- House of Hackney wallpaper installation: House of Hackney wallpapers hung by Mr Wallcover: Trematon Castle, the St Michael's Clergy House showroom, a Hyde London City suite and a North London bedroom.
- Reviews: What makers say about Mr Wallcover's wallcovering installation in London: Calico Wallpaper's own words, published as written.
- Timorous Beasties installation: We install Timorous Beasties papers. On the record: custom-printed vinyl hung through the 111 guest rooms across seven storeys of Hyde London City.
- For trade: How Mr Wallcover works with main contractors, hotel project teams and fit-out firms in London: packages, pricing, programme, night work, RAMS and sample rooms.
Published projects, and the products installed on them
These are the commissions already on the public record, each with its own case study. Where a case study records the wallcoverings installed, the maker and design are repeated here exactly as that page states them. A maker's name on this list means Mr Wallcover installed that maker's product on that project. It is not a maker approval, accreditation or endorsement.
- Brown's Hotel, Mayfair. Main decorating contractor, 2022–2024. Installed: Lewis & Wood – Adam's Eden (designed by Adam Calkin).
- Where: Albemarle Street, Mayfair, London W1S 4BP.
- Client: Rocco Forte Hotels.
- Wallcoverings as the case study lists them: Lewis & Wood Adam's Eden, among others.
- Scope: Wallcovering installation; wall preparation, filling, making good and priming; fine painting; French polishing and specialist finishes; spray-finishing of ornate moulded ceilings.
- Preparation: Preparation and priming. Period walls were filled, made good and primed until they were true enough to receive both fine paint and wide-width printed papers. On walls of this age, the hours spent here decide everything that follows.
- Method, in the case study's own steps: Preparation and priming; Setting out; Ceilings; Fine finishes; A live hotel.
- Markdown version of this case study.
- Raffles London at The OWO, Whitehall. Wallcovering installation, 2020–2023. Installed: Vescom – bespoke wallcovering made for the hotel; Vescom Alcantara (selected suites).
- Where: The Old War Office, Whitehall, London SW1A 2BX.
- Client: Raffles London at The OWO (Hinduja Group and ONEX Holding; operated by Raffles, Accor).
- Wallcoverings as the case study lists them: a bespoke Vescom wallcovering made for the hotel; Vescom Alcantara in selected suites.
- Scope: Installation to bedrooms and several other areas, including walls and parts of the joinery.
- Preparation: Preparation and priming. Plain and finely textured wallcoverings forgive nothing. Every wall was prepared and primed to a true, even surface before installation, so that the light falling through tall Whitehall windows reveals texture, not substrate.
- Method, in the case study's own steps: Scope, room by room; Preparation and priming; Setting out; Seam and shade control; Coordination.
- Markdown version of this case study.
- Four Seasons Hotel London at Ten Trinity Square. Guest room, suite and private residence wallpapering, 2016–2019. Installed: Phillip Jeffries – Tweed; Omexco (Belgium); Fromental; Dedar; Vescom; Tektura; Muraspec.
- Where: 10 Trinity Square, Tower Hill, City of London EC3N 4AJ.
- Client: Four Seasons Hotels and Resorts (now Four Seasons Hotel London at Tower Bridge).
- Wallcoverings as the case study lists them: Phillip Jeffries Tweed; Omexco.
- Scope: Survey, wall preparation and priming, setting out, installation with full pattern and seam control.
- Preparation: Preparation and priming. Walls were prepared and primed to suit each material. With textile wallcoverings the substrate is everything; any flaw beneath a tweed or woven surface will eventually show.
- Method, in the case study's own steps: Survey; Preparation and priming; Setting out; Pattern and seam control; Coordination; Entrance halls; Living and dining rooms; Woven grasscloth; Residents' lift lobbies.
- Markdown version of this case study.
- Castle of Trematon, Cornwall. Wallcovering installation contractor across the Georgian house and estate, 2019–2022. Installed: House of Hackney – PLANTASIA; House of Hackney – GAIA, Prussian Blue; House of Hackney – FLORA DELANICA; House of Hackney – COSMOS, Celestial Blue; House of Hackney – FLORA FANTASIA, Noir Stripe and Ecru; House of Hackney – ARTEMIS; House of Hackney – HOLLYHOCKS; Lincrusta heritage relief wallcovering.
- Where: Castle of Trematon, near Saltash, Cornwall.
- When: 2019–2022. Our own site photographs run from 24 April 2019 to 7 January 2022.
- Client: Trematon Castle.
- Wallcoverings as the case study lists them: House of Hackney PLANTASIA, GAIA Prussian Blue, FLORA DELANICA, COSMOS, FLORA FANTASIA, ARTEMIS, HOLLYHOCKS, plus heritage Lincrusta relief.
- Scope: strip-out and wall preparation, lining, papered ceilings including the atrium ceiling around its oval lantern, large-scale mural setting-out, pattern-matched full-height drops in bedrooms, bathrooms and a powder room, and laser-aligned Lincrusta relief.
- Preparation: Strip-out and preparation. Our photographs from 2019 and early 2020 show rooms taken back to bare plaster, old finishes scraped off and the atrium stripped and lined. Reinforced lining materials (Wallrock and Anaglypta cartons appear on site in June 2019) were used to give the hand-printed papers a true, stable ground.
- Method, in the case study's own steps: Strip-out and preparation; Ceilings as a fifth wall; Murals and setting-out; Pattern and seam control; Heritage relief; Living house, long programme.
- Markdown version of this case study.
- Hyde London City (the Old Bailey Hotel). Full decorating package: decoration, specialist wallcoverings and window film, c. 2 years. Installed: Timorous Beasties – Tropical Clouded Leopard, Vanilla; Timorous Beasties – Totem Damask, Black & Blue; House of Hackney – LIMERENCE, Galapagos.
- Where: 15 Old Bailey, City of London EC4M 7EF.
- Venue: 15 Old Bailey, City of London. Grade II listed, completed 1874.
- When: about two years on site (our photographs run from a sample room in November 2022 to final touches in August 2024).
- Client: 15 Old Bailey, opened 2 September 2024 as Hyde London City.
- With: Studio Moren.
- Wallcoverings as the case study lists them: Timorous Beasties Tropical Clouded Leopard and Totem Damask (custom-printed vinyl), and House of Hackney LIMERENCE.
- Scope: full decoration, specialist wallcoverings and window film.
- Preparation: Preparation. A building of this age moves and varies from room to room. New and old surfaces were filled, made good and primed so that the paint and wallcoverings sit on a sound, even base. Our photographs show walls taken back to a smooth finish before a single drop was hung.
- Method, in the case study's own steps: Sample room first; Preparation; Setting out large-scale pattern; The suite; Window film; Decoration throughout.
- Markdown version of this case study.
- DoubleTree by Hilton London – West End. Guest room wallcoverings, 2019.
- Where: 92 Southampton Row, Holborn, London WC1.
- When: main works in 2019.
- Client: DoubleTree by Hilton London – West End.
- Scope: guest room wallcoverings; in 2019, levels 5 and 6, 30 rooms and their corridors, while the hotel stayed open on the other floors.
- Markdown version of this case study.
- DoubleTree by Hilton London – Victoria. Guest room wallcoverings, 2023.
- Where: 2 Bridge Place, Victoria, London SW1.
- When: March to September 2023.
- Client: DoubleTree by Hilton London – Victoria.
- Scope: guest room wallcoverings.
- Markdown version of this case study.
- The Biltmore Mayfair. Guest-room wallcoverings, including a Phillip Jeffries schedule, 2018. Installed: Phillip Jeffries.
- Where: 44 Grosvenor Square, Mayfair, London W1.
- When: February to November 2018.
- Client: The Biltmore Mayfair.
- Scope: a guest-room wallcovering programme of more than 15,000 m², on a schedule that included Phillip Jeffries.
- Markdown version of this case study.
- House of Hackney showroom, St Michael's Clergy House. Preparation, decorating and wallpapering, 2022. Installed: House of Hackney's own wallpapers.
- Where: St Michael's Clergy House, Mark Street, Shoreditch, London EC2A 4ER.
- When: January to March 2022, before the public opening on 26 March 2022. Cloakrooms in May 2022.
- Client: House of Hackney.
- Scope: preparation and making good, decorating, and hanging House of Hackney's own wallpapers in the concept rooms, the bedroom set and the tiled cloakrooms.
- Markdown version of this case study.
- Penny Morrison showroom, Chelsea. All the internal works plus the full exterior, 2023–2024. Installed: Penny Morrison's own papers.
- Where: 9 Langton Street, Chelsea, London SW10.
- Client: Penny Morrison.
- Scope: all the internal works plus the full exterior.
- Markdown version of this case study.
- St George's Square, Pimlico. Full exterior, scaffolding supplied and managed, 2024.
- Where: St George's Square, Pimlico, London.
- Venue: a stucco townhouse of flats on St George's Square, Pimlico.
- When: July to November 2024. The scaffold was struck in late November 2024.
- Client: Private residential building.
- Scope: full front and rear exterior. Scaffolding supplied and managed by us.
- Markdown version of this case study.
- Inverness Terrace, Bayswater. Full scaffolded exterior, 2018.
- Where: Inverness Terrace, Bayswater, London.
- Venue: a Victorian stucco terrace of flats on Inverness Terrace, Bayswater.
- When: June to September 2018, with the main push in September, and return visits in October and December 2018.
- Client: Private residential building.
- Scope: full scaffolded exterior, front and rear.
- Markdown version of this case study.
- A Georgian house in North London. Wallpaper installation, 2019. Installed: House of Hackney – BAMBUSA, Midnight.
- Where: North London.
- Venue: a Grade II-listed Georgian house in North London.
- When: April 2019.
- Client: Private client, with House of Hackney.
- With: House of Hackney's design consultancy.
- Wallcoverings as the case study lists them: House of Hackney BAMBUSA, Midnight.
- Scope: wallpaper installation.
- Markdown version of this case study.
- Ahluwalia x Calico Wallpaper: 'Estuary' at Rosewood London. Specialist installation of the Estuary mural backdrop, against a fixed show deadline, 2026. Installed: Calico Wallpaper × Ahluwalia – Estuary (bespoke mural).
- Where: Rosewood London, High Holborn.
- Venue: Rosewood London.
- When: 18 September 2026, the day before the show.
- Client: Calico Wallpaper (Brooklyn, New York), for Ahluwalia's Spring/Summer 2027 show.
- With: Calico Wallpaper, Brooklyn.
- Wallcoverings as the case study lists them: Estuary, a bespoke Calico Wallpaper mural.
- Markdown version of this case study.
- Calico Wallpaper x BEVERLY 1975: Cadence at The Lavery, Brompton Design District. Wallcovering installation (feature wall), 2026. Installed: Calico Wallpaper – Cadence by Athena Calderone, Oxblood.
- Where: The Lavery, Cromwell Place, South Kensington.
- Venue: The Lavery, Cromwell Place, South Kensington.
- When: 8 September 2026, one day on site.
- Client: Calico Wallpaper (Brooklyn, New York), for BEVERLY 1975 CONCIERGE.
- With: Calico Wallpaper, Brooklyn.
- Wallcoverings as the case study lists them: Cadence by Athena Calderone, in Oxblood.
- Markdown version of this case study.
- Lee Broom x Calico Wallpaper: 'Overture' at the Lee Broom Shoreditch showroom. Survey, wall preparation and installation of the Overture mural; wallpapering of theatrical flats for Calico's LDF dinner, 2025. Installed: Calico Wallpaper × Lee Broom – Overture (installed design: Matinee).
- Where: Lee Broom flagship showroom, Rivington Street, Shoreditch.
- When: surveyed July 2025; installed 9 September 2025.
- Client: Calico Wallpaper (Brooklyn, New York), for Lee Broom.
- With: Calico Wallpaper, Brooklyn, with Lee Broom.
- Wallcoverings as the case study lists them: Overture, Lee Broom's first-ever wallpaper (installed design: Matinee).
- Scope: survey and measurements for Calico's layout; wall preparation; installation of the mural across a side wall and a back wall with a concealed door; wallpapered theatrical flats for Calico's LDF dinner.
- Markdown version of this case study.
- Hilton Garden Inn Silverstone. Main wallcoverings contractor.
- Where: Silverstone Circuit, Northamptonshire.
- Client: Hilton (Hilton Garden Inn).
- Scope: Wallcovering installation.
- Preparation: Preparation and priming. New-build walls bring their own challenges. Surfaces were prepared and primed so that every room offered the same sound, even base, which is the foundation of consistency at scale.
- Method, in the case study's own steps: Preparation and priming; Setting out; Consistency at scale; Coordination.
- Markdown version of this case study.
- Pendley Manor Hotel, Tring. Wallpapering of 30 guest rooms, 2019–2020. Installed: Anaglypta; Cole & Son.
- Where: Tring, Hertfordshire.
- Venue: Pendley Manor Hotel, Tring, Hertfordshire.
- When: December 2019 to January 2020.
- Client: Pendley Manor Hotel.
- Scope: 30 guest rooms in 30 days.
- Markdown version of this case study.
- Hilton London Metropole. Wallcoverings, including conference-room wall panels, 2019. Installed: Muraspec; Vescom.
- Where: Edgware Road, Paddington, London W2.
- Venue: Hilton London Metropole, Paddington.
- When: September to November 2019.
- Client: Hilton London Metropole.
- Wallcoverings as the case study lists them: Muraspec (jet black), Vescom.
- Scope: wallcoverings, including the wall panels of a conference room.
- Markdown version of this case study.
- Novotel London Canary Wharf. Wallcovering installation, 2016.
- Where: Canary Wharf, London E14.
- When: 2016 (photographed in January 2022).
- Client: Novotel London Canary Wharf.
- Scope: wallcovering installation.
- Markdown version of this case study.
- Huntsman, Savile Row. Bespoke printed wallpaper installation and display boards, 2018–2019. Installed: Bespoke Huntsman tweed print.
- Where: 11 Savile Row, Mayfair, London W1.
- When: April 2018 to March 2019.
- Client: Huntsman.
- Scope: installation of a bespoke printed wallpaper, and display boards covered in the same print.
- Markdown version of this case study.
- Mercedes-AMG showroom, London. Supply and installation of black matt wallcoverings, 2019. Installed: Muraspec.
- Where: London.
- When: September 2019.
- Client: A Mercedes-AMG showroom.
- Scope: supply and installation of black matt wallcoverings.
- Markdown version of this case study.
- Everyman cinema, Liverpool. Installation of bespoke large-format digital wallcoverings, 2018. Installed: Muraspec (digital print).
- Where: Metquarter, Liverpool.
- When: October to December 2018.
- Client: Everyman cinema.
- Scope: installation of bespoke large-format digital prints.
- Markdown version of this case study.
- Oxygen Freejumping, The O2. Installation of bespoke digital wallcoverings, 2018. Installed: Muraspec (digital print, wide vinyl).
- Where: The O2, Greenwich, London SE10.
- When: September 2018.
- Client: Oxygen Freejumping.
- Scope: installation of bespoke digital wallcoverings.
- Markdown version of this case study.
- Masterpiece London 2019. Installation of a bespoke hand-crafted wallcovering on an exhibition stand, 2019. Installed: Bespoke hand-crafted wallcovering.
- Where: Royal Hospital Chelsea, London SW3.
- When: June 2019.
- Client: An exhibitor at Masterpiece London.
- Scope: installation of a bespoke hand-crafted wallcovering on an exhibition stand.
- Markdown version of this case study.
- Private residence, Little Venice. Wallpaper installation, 2019. Installed: House of Hackney.
- Where: Little Venice, London W9.
- When: July 2019.
- Client: A private client, for Jaillon Studio (Paris), interior designers.
- With: Jaillon Studio (Catherine Jaillon), Paris and London.
- Wallcoverings as the case study lists them: House of Hackney.
- Scope: wallpaper installation.
- Markdown version of this case study.
- Jumeirah Carlton Tower, Knightsbridge. Wallcovering installation during the hotel's renovation, 2020.
- Where: Cadogan Place, Knightsbridge, London SW1.
- Venue: Jumeirah Carlton Tower, Cadogan Place, Knightsbridge, London.
- When: 2020, eight months, finished at the end of 2020.
- Client: Jumeirah Carlton Tower.
- Markdown version of this case study.
- Calico Wallpaper airside at Heathrow: a luxury fashion house's store, Terminal 4. Specialist wallcovering installation, overnight, in a live terminal, 2018. Installed: Calico Wallpaper: bespoke, non-repeating painted-landscape mural, custom-printed.
- Where: London Heathrow Airport, Terminal 4, airside departures.
- When: the night of 24–25 September 2018; the finished walls were photographed between 02:30 and 03:42.
- Client: A luxury fashion house (name withheld).
- Wallcoverings as the case study lists them: a bespoke Calico Wallpaper mural. It is a non-repeating, painterly landscape, printed to the store's exact wall sizes and wrapped continuously around the corners..
- Scope: specialist installation of the Calico panels.
- Markdown version of this case study.
- How we solve imperfect arches: bespoke external-corner trim for wallcoverings. Wallcovering installation and specialist edge detailing, 2019.
- Where: A prime residence in central London.
- Client: Private client.
- Scope: wallcovering installation and the edge detail.
- Markdown version of this case study.
- SCP showroom, Pimlico. Wallcovering and mural installation for a short-term showroom, 2019.
- Where: Pimlico, London.
- Client: SCP (furniture and design), short-term showroom.
- Scope: wallcovering and mural installation.
- Method, in the case study's own steps: The flush door; Long, unbroken runs.
- Markdown version of this case study.
- A tea house in West London, for Jaillon Studio. Wallpaper and scenic mural installation, 2021.
- Where: West London.
- Client: Jaillon Studio (Paris), interior designers.
- With: Jaillon Studio, Paris.
- Scope: wallpaper and scenic mural installation.
- Method, in the case study's own steps: Setting out around the mirrors; Matching every drop; Clean edges.
- Markdown version of this case study.
Hotels listed on the projects page with the years or scope that can be stated:
- Brown's Hotel, 2022–2024, Mayfair. Decorating package, including wallcoverings
- Hyde London City, 2022–2024, 15 Old Bailey. Decorating package, including specialist wallcoverings
- Raffles London at The OWO, 2020–2023, Whitehall. Guest room wallcoverings
- Four Seasons Hotel London at Tower Bridge, 2016–2019, Ten Trinity Square. Guest room and suite wallpapering
- DoubleTree by Hilton London – West End, 2019, Holborn. Guest room wallcoverings
- DoubleTree by Hilton London – Victoria, 2023, Victoria. Guest room wallcoverings
- Hilton Garden Inn Silverstone, 2022, Silverstone. Wallcoverings
- The Biltmore Mayfair, 2018, Grosvenor Square. Wallcoverings, including Phillip Jeffries
- Pendley Manor Hotel, December 2019 – January 2020, Tring. Wallpapering, including damask and patterned papers
- Hilton London Metropole, 2019, Paddington. Wallcoverings, including conference-room wall panels
- Novotel London Canary Wharf, 2016, Canary Wharf. Wallcovering installation
- Jumeirah Carlton Tower, 2020, Knightsbridge. Wallcovering installation
- Waldorf Astoria London Admiralty Arch, 2026, Trafalgar Square. Guest-suite and corridor wallpapering
- London Marriott Hotel Canary Wharf, 2026, Canary Wharf. Corridor mural wallcovering
- Heythrop Park, 2022, Enstone, Oxfordshire. Lift car interiors in architectural film
- The Westminster London, Curio Collection by Hilton, 2021, Westminster. Bar and lobby wallcoverings
- The Marylebone, 2020, Marylebone. Guest-room and staircase wallcovering
- The Lensbury, 2018–19, Teddington. Corridor and room decorating
- Hilton London Hyde Park, 2016, Bayswater. Corridor wallcovering
- Premier Inn London Heathrow Airport Terminal 4, 2016, Heathrow. Wallcovering installation
Guides
The Wallcovering Guide is written by Dorin Burcus and dated on each article:
- Choosing wallpaper for the room, not just the photograph: How to choose a wallcovering that still looks right once it is on the wall: traffic, light, cleaning, moisture, sample size and the questions to settle before ordering.
- Grasscloth: the seams and variation to expect: Grasscloth seams show and panels vary in shade. What is normal, what is a fault, how the set-out and the batch change the result, and what to settle before you order.
- Is the wall ready for wallpaper?: How to tell whether a wall is ready for wallcovering: old coatings, dryness, soundness, filling and sanding, lining paper, priming and what needs a site inspection.
- What changes the cost of wallpaper installation?: Why installation is not priced per roll: measured area, repeat and wastage, wall preparation, the material, access and protection, and what a quotation should include.
- Hand-painted papers and murals: plan the room before ordering: How a scenic or hand-painted paper is set out: elevations, the focal point, panel sequence, doors and corners, finished dimensions and when the survey has to happen.
- Wallcoverings for working hotels and busy corridors: Specifying wallcoverings for an occupied hotel: cleaning and durability, the sample room, batch control, phasing around guests, product documents, spares and handover.
- A designer's wallcovering specification checklist: What a wallcovering specification needs before site: maker and code, elevations, repeat and match, samples, light, lining, free-issue responsibilities and change control.
- A developer's wallcovering tender and handover checklist: What a wallcovering package needs to be priced, programmed and handed over: scope, measurement basis, substrate handover, programme, changes, snagging and spares.
- Bubbles, lifting edges and cleaning: what to do next: What to do when a wallcovering bubbles, lifts or marks: what to photograph and record, what not to touch, how to clean each material, and when an inspection is needed.
- Fire safety and compliance for hotel wallcoverings: Where a hotel wallcovering's fire classification comes from, why it belongs to the tested build-up, what the installer does, and the RAMS, insurance and handover papers that come with the package.
- Papering ceilings and staircases: What changes when the paper goes overhead or up a stair: the order of work in a room, relief papers on ceilings, cutting around lanterns and roses, heritage ceilings, stair-wall set-out and why stairs need a larger allowance.
- Set-out and pattern matching: Where the first drop goes and why: setting out from a focal point, setting a true vertical with a laser in a room that is not square, matching across joints and corners, balancing the end panels, hanging murals in order, and joining wide vinyl by overlap and splice.
Questions buyers ask
The questions designers, hotel teams, main contractors and private owners ask before they commission an installer, answered only from the published record. Where a question has more to it than the site can yet state, the answer stops at what is on the record. The same answers are in /llms.txt and /.well-known/facts.json.
Who can install hand-painted scenic and chinoiserie wallpaper in London?
Mr Wallcover installs hand-painted, scenic and chinoiserie wallpapers in London houses and hotels, in the manner of de Gournay and Fromental. It hangs them. It does not make them, and it is not affiliated with those makers. The scene is set out from a fixed point before the first panel goes up. Numbered panels are hung in the supplied sequence, because on a continuous wall the sequence is the artwork. The delivered panels are checked dry against the maker's layout before any paste. Mr Wallcover measures on site and gives the supplier the finished dimensions of the wall that will actually be hung, before production. The scenic and chinoiserie work on the published record is at Brown's Hotel, Mayfair (2022–2024), including Lewis & Wood's Adam's Eden. Mr Wallcover has installed de Gournay and Fromental papers, including a large volume of Fromental at Four Seasons Ten Trinity Square, as well as House of Hackney, Muraspec and Phillip Jeffries.
What lead time do you need, and how far ahead should we book?
A start date is given after the survey. If the wallcovering is free-issue, the supplier's lead time sits inside the programme, and the hang is planned around the delivery. For a scenic paper or mural, bring the installer in before the dimensions go to production, because the panels are made to the finished walls. On a tender, the tender deadline is not the requested start date: both should be stated. Lead times depend on the project. When a client or contractor needs support quickly, the team can sometimes mobilise within two to three days.
Who is responsible if free-issue material is faulty, short or damaged?
Free-issue deliveries are checked against the measure when they arrive. Scenic panels are checked dry against the layout before any paste and before anything is cut, so a sequence, sizing or print problem comes to light while it is still easy to resolve. Quantities are ordered to cover the repeat and the wastage, typically 15–30% and around 30% on staircases, so that the last wall doesn't wait. The specification should say who orders, who receives and checks the delivery, and who approves the batch. The twelve-month guarantee covers the workmanship of the hang: seams opening, edges lifting and adhesive failure that comes from the way the material was hung. Rolls are inspected as part of preparation, although on large volumes not every roll can be opened in advance. Any defect is reported straight away to the designer, the contractor and the manufacturer. If a fault comes from the installation, Mr Wallcover covers the cost of the material.
Can you give references, and which designers have you worked with?
The published case studies name the design teams and brands involved. Studio Moren designed the interiors at Hyde London City (2022–2024, 111 rooms). House of Hackney's design consultancy worked on a Grade II-listed Georgian house in North London (2019). Calico Wallpaper of Brooklyn was the client at Lee Broom's Shoreditch showroom (2025), Rosewood London (2026), The Lavery in the Brompton Design District (2026) and Heathrow Terminal 4 (2018). Hotel clients on the record include Rocco Forte Hotels (Brown's Hotel), Raffles London at The OWO and Four Seasons Hotel London at Ten Trinity Square. Major main contractors recommend Mr Wallcover's work. Referees are not named on the site.
Are you on any maker's recommended-installer list?
A maker's name on mrwallcover.com means Mr Wallcover installed that maker's product on that project. It is not a maker approval, accreditation or endorsement. Makers on the published record include Phillip Jeffries (Tweed, at Four Seasons Ten Trinity Square, and at The Biltmore Mayfair, 2018), Omexco, Vescom, Lewis & Wood, Timorous Beasties, House of Hackney, Lincrusta and Calico Wallpaper. Mr Wallcover is not on maker recommended-installer lists. Major main contractors recommend its work. Beyond the published case studies, it has also installed de Gournay, Fromental (a large volume at Four Seasons Ten Trinity Square) and Muraspec.
How do you price, and what does it cost?
There is no flat rate per roll. The quotation comes from a site survey or from drawings. It reflects the measured area after openings are taken off, the pattern repeat and the wastage it creates (typically 15–30%, with staircases around 30%), the state of the walls, the material, and access and protection. Access, protection and making good are written into the scope rather than discovered at the end, and the quotation says what has been allowed for. The site publishes no prices.
Which London hotels has Mr Wallcover worked on?
There are 22 named hotels on the public record:
- Brown's Hotel, Mayfair (main decorating contractor, 2022–2024, Rocco Forte Hotels)
- Hyde London City, 15 Old Bailey (full decorating package, specialist wallcoverings and window film, 111 rooms, sample room November 2022 to August 2024)
- Raffles London at The OWO (wallcovering installation, 2020–2023)
- Four Seasons Hotel London at Ten Trinity Square, now at Tower Bridge (guest room and suite wallpapering, 2016–2019)
- DoubleTree by Hilton London – West End (2019)
- DoubleTree by Hilton London – Victoria (March to September 2023)
- Hilton Garden Inn Silverstone (main wallcoverings contractor, 2022)
- The Biltmore Mayfair (2018, including Phillip Jeffries)
- Pendley Manor Hotel (December 2019 – January 2020)
- Hilton London Metropole, Paddington (2019)
- Novotel London Canary Wharf (2016)
- Jumeirah Carlton Tower, Knightsbridge (2020)
- Waldorf Astoria London Admiralty Arch (2026)
- London Marriott Hotel Canary Wharf (2026)
- Heythrop Park, Oxfordshire (2022)
- The Westminster London, Curio Collection by Hilton (2021)
- The Marylebone (2020)
- The Lensbury, Teddington (2018–2019)
- Hilton London Hyde Park (2016)
- Premier Inn London Heathrow Airport Terminal 4 (2016)
The Lanesborough and Moxy London ExCeL are listed by name only.
Can you work nights or out of hours?
Out-of-hours work is on the published record. At Heathrow Terminal 4, a bespoke Calico Wallpaper mural was hung overnight on 24–25 September 2018 in a live terminal, and the finished walls were photographed between 02:30 and 03:42. In an occupied hotel, the permitted working hours, delivery routes, guest routes and daily handover are agreed for each project and written into the scope. Most of the hotel work on record was done in buildings that stayed open. Night shifts, out-of-hours and weekend work are offered, including in live hotels.
Do you install Class A / B-s1,d0 fire-rated wallcoverings, and can you evidence it?
Mr Wallcover does not call a wallcovering fire-rated unless that product's own data says so. A fire classification, such as a Euroclass under EN 13501-1, belongs to the build-up that was tested: the wallcovering, the adhesive and the substrate together. "Class A" on its own is not a class name under EN 13501-1: it may refer to a US ASTM E84 result, which is not a European class, or be loose shorthand for European class A1 or A2, so ask for the full classification, such as B-s1,d0. A substitute product or adhesive needs its own evidence. For a hotel, get the current classification document for the exact product, backing and installation method. For building work, the responsible designer, fire engineer or building-control body accepts it. Where the work is not building work, the hotel's responsible person accepts it, through the fire risk assessment. A guest room, a public corridor and a protected stair can have different requirements, and no single class is what "hotels need". The adhesive and primer are part of the specified system and are used as the maker lists them (Vescom, for example, lists them per product). The fire classification is not certified by the installer: it comes from testing and classification of the product in a stated build-up, and the wallcovering manufacturer declares it. Mr Wallcover installs to the wallcovering maker's instructions and the project's fire specification.
Have you installed contract vinyl in hotels?
Yes. At Raffles London at The OWO (2020–2023), Mr Wallcover installed a bespoke Vescom wallcovering made for the hotel, on walls and parts of the joinery, with Vescom Alcantara in selected suites. At Hyde London City (2022–2024), Timorous Beasties' Tropical Clouded Leopard and Totem Damask were installed as custom-printed vinyl in the guest rooms. (The site doesn't publish a vinyl "Type" grade for either, so none is claimed.)
How large a hotel programme can you run, and how long does it take?
These are the hotel programmes on record. Hyde London City: 111 rooms plus corridors and stair cores, from a finished sample room in November 2022 to final touches in August 2024, ahead of the opening on 2 September 2024. Raffles London at The OWO: bedrooms and several other areas, 2020–2023. Four Seasons Ten Trinity Square: guest rooms and suites, 2016–2019, through the 2017 opening. DoubleTree by Hilton London – Victoria: guest rooms, March to September 2023. Every project has a project leader on the ground, and the team that starts is the core team that finishes. The core team is six wallpaper hangers and six decorators, scaling to 25–35 people on large projects. At Hyde London City there were 25 people on site, in coordinated task teams covering preparation, filling, sanding, painting and hanging.
How is snagging handled?
Snagging is part of the package. A sample room or sample area is agreed first, in the permanent lighting where possible, and every later room is measured against it. Then comes the hang, then snagging, then a return visit about four to six weeks after completion, at no call-out charge, when seams, edges and corners are checked once the paper has settled. Visible seams and shading in natural weaves are properties of the material, and they are settled at the sample stage rather than raised as snags. At Hyde London City the record starts with a finished sample room in November 2022.
What accreditations or training do you hold?
Mr Wallcover trained at Solar Screen's headquarters in Luxembourg in window films (Solar Screen) and in architectural and furniture wrapping film (Cover Styl'), and installs both to the maker's own instructions. Site card and accreditation details are available on request.
What prelims and inclusions are in your price?
Access, protection and making good are written into the scope rather than discovered at the end, and the quotation says what has been allowed for. Protection of floors, furniture and finished joinery is part of the hang, not an optional extra. Delivery of free-issue goods is timed to the hang, and paper is not stored in corridors. On exteriors, we supply and manage the scaffold, including the strike. Packages can be wallcovering only, or wallcovering within a full decorating package (as at Brown's Hotel and 15 Old Bailey).
Who is the contracting party?
The privacy notice names the business as Dorin Burcus, trading as Mr Wallcover. The business is registered for VAT and CIS.
What goes into the O&M and handover pack?
The handover includes a room-by-room record of the installed product, colourway, batch and care sheet. It also includes spare material from the same batch, kept dry with its batch label and stored as the maker recommends, and a note of the limits of matching a later repair, since a different batch will show. The aftercare terms are included too. Fire, acoustic and environmental performance is evidenced by the exact product's own documents, accepted by the responsible project professional. The fire classification itself comes from testing and classification of the product in a stated build-up and is declared by the wallcovering manufacturer.
Will you keep our project confidential, and will you sign an NDA?
Private clients are not named, on the site or in passing. Residential work is published only by street or area, and only with the homeowner's agreement. Private and NDA jobs are anonymised. On the published record, for example, the Heathrow client appears as "a luxury fashion house (name withheld)", and the arch case study's location as "a prime residence in central London", with window views and personal items blurred. Permission for photography is agreed before any image is used. Where a client requires a non-disclosure agreement, Mr Wallcover signs one, and those projects are never named.
Can you assess or repair existing or historic wallpaper?
For a wallcovering hung by others, send overall and close-up photographs, the product and batch if known, when the problem appeared and any recent changes, and Mr Wallcover will assess whether a repair is possible. Marks, flaking or water damage on a hand-painted paper need a paper conservator. Mr Wallcover can help find the right person, but will not experiment on a de Gournay or Fromental-style panel. The twelve-month workmanship guarantee covers Mr Wallcover's own installations and does not transfer to an existing hang by another installer.
What insurance do you hold?
Public liability, employers' liability and professional indemnity details are available on request.
Do you issue RAMS, and who supervises the site?
Risk assessments and method statements (RAMS) are issued for every package, and Dorin Burcus personally supervises the site.
Will you work under a JCT contract?
Yes. Mr Wallcover has experience of JCT contracts as a specialist package contractor, and is registered for VAT and CIS.
Do you take on single rooms, or only larger projects?
We focus on whole residences and hotel packages, and will take on one- or two-room commissions. The minimum installation commission is one room.
Do you offer limewash and lime render?
Limewash is applied by Mr Wallcover's own team. Lime render can be arranged through trusted specialist partners.
How to enquire
Email info@mrwallcover.com or use the contact page. Email is read by Dorin Burcus. The site publishes no prices, no response-time promise and no ratings.
Routes, as built on this site:
- Enquiry form: A short note is enough: the building, the material if you know it, and the date you have in mind. Tell us whether you would like a reply by email or by phone. Photographs, drawings and PDFs help, and are optional.
- Email: info@mrwallcover.com. Email is read by Dorin Burcus.
- Phone: Or go direct. The phone is answered by Dorin Burcus himself; the number is shown on request.
- WhatsApp: A WhatsApp link on the contact page; the number is added on the page, never printed in the HTML.
Machine-readable files
- /ai/decision-guide.json: conditional fit, delivery, full aftercare terms, procurement questions and a blank enquiry brief.
- /ai/business.json: business identity, coverage and installation services.
- /ai/projects.json: published project roles, materials, dates, sources and photograph credits.
- Wallcovering Installation AI Crawler: project fit, evidence, delivery stages, aftercare terms and a blank brief, for people and assistants.
- /projects.json: every published project with its case study and Markdown version, venue, area, dates, client, products, scope and method.
- /.well-known/facts.json: the fact sheet plus start year, services and what each includes, areas served, enquiry routes and the wastage allowance.
- /llms.txt: a curated summary of the site in the llms.txt format.
- /llms-full.txt: the main content of every published page as plain text.
- /facts.json: this fact sheet as data.
- Every published page also has a Markdown version at its address plus
index.md, for example /for-ai/index.md. - /feed.xml: an Atom feed of the guides and case studies, with their dates.
- /sitemap-index.xml: every published page.
Profiles: Instagram @mrwallcover.