92 Southampton Row, Holborn, London WC1

DoubleTree by Hilton London – West End

Guest room wallcoverings at the Holborn hotel, the former Bonnington, through the main works of 2019: two full floors, 30 rooms and their corridors, finished while the hotel stayed open.

The DoubleTree by Hilton London – West End on Southampton Row, Holborn: the red-brick and stone frontage, seen from the street.
The hotel on Southampton Row, 2024. Venue photograph, not our work. Photograph: Frombowen / Wikimedia Commons (CC BY-SA 4.0).

Project record

Client, materials & project facts
Client
DoubleTree by Hilton London – West End
Designer
Not recorded
Main contractor
Not recorded
Maker and paper
Not recorded
Area or rooms
30 rooms on two floors, while the hotel stayed open (2019)
Scope
Guest room wallcoverings
Year
2019

At a glance

  • Hotel: DoubleTree by Hilton London – West End
  • Address: 92 Southampton Row, Holborn
  • Years on site: main works in 2019
  • Scope: guest room wallcoverings; in 2019, levels 5 and 6, 30 rooms and their corridors, while the hotel stayed open on the other floors
  • Formerly: the Bonnington Hotel

The work

The commission was the guest rooms. Pattern, batch and the order of rooms were agreed before the first length was cut, so a repeated room could stay consistent down a corridor.

In July 2019 we completed levels 5 and 6: 30 Premium and Deluxe rooms and their corridors. The hardest part was working in a hotel that was still open, with guests on the other floors. We first worked here in December 2017, hanging Tektura wide vinyl.

The first photographs on this page show the Southampton Row building from the street, before and after it took the DoubleTree name. They show the building, not the finished rooms. The rest are our own photographs of the finished rooms and corridors.

Next step

For a similar guest-room package, send the room types, the programme and who supplies the material; a survey then decides preparation, quantities and the order of rooms.

Photographs on this page

The first three are photographs of the building, two of them by the photographers credited below. They show the building, not our work.

The others are our own photographs of the finished rooms and corridors, first posted on our Instagram, @mrwallcover: one from December 2017 (see the post) and the rest from 19 July 2019 (see the post), the post that records the 30 rooms on levels 5 and 6.

How the commission ran

The same standards, on every commission.

Each commission has a written scope by room, walls prepared until they are true, protected floors, batch and shade control, set-out from the room’s focal points, and a return visit. Read the method.

The six standards in full
  1. 01

    Survey and scope, room by room

    We measure the wall that will actually be hung, allow for the repeat and the wastage, and write a scope of works room by room before anyone orders paper.

  2. 02

    Preparation decides the finish

    Walls are filled, made good and primed until they are true. If a wall is not ready for the material specified, we say so before the last drop is ordered.

  3. 03

    Protection and containment

    Floors, furniture and finished joinery are protected as part of the hang. Work is contained and the place is left tidy each evening. In a home we are visitors; in a hotel we work around the house.

  4. 04

    Batch and shade control

    Deliveries are checked against the measure, and batches and shading are managed so that a corridor of rooms reads as one surface.

  5. 05

    Set out from the room's focal points

    Pattern is set out from chimneypieces, doorcases and bed walls, so the pattern sits square to the cornice and the joinery.

  6. 06

    One team, then the return visit

    The people who start are the people who finish. Four to six weeks after completion we come back to look at every seam and edge, and the workmanship is guaranteed for twelve months.

See the finish up close: seams, internal corners, edges and joins from our own installations

By Dorin Burcus, founder · Last updated