St George's Square, Pimlico, London

St George's Square, Pimlico

A full exterior on St George's Square in 2024: scaffold supplied and managed by us, masonry and render repairs, painting, windows and the entrance ironwork.

Finished white columned entrance and black railings on St George's Square, Pimlico, with the scaffold down.

Project record

Client, materials & project facts
Client
Private residential building
Designer
Not recorded
Main contractor
Not recorded
Maker and paper
Not recorded
Area or rooms
Not recorded
Scope
Full exterior, scaffolding supplied and managed
Year
2024

At a glance

  • Building: a stucco townhouse of flats on St George’s Square, Pimlico
  • Survey: June 2024
  • Works: July to November 2024. The scaffold was struck in late November 2024
  • Scope: full front and rear exterior. Scaffolding supplied and managed by us

The work

The survey was in June 2024. Works ran from July to November 2024, and the scaffold came down in late November.

We supplied and managed the scaffold for the front and the rear. Repairs took in the cornice, the pediment and the portico, where cracks were made good, and the parapet. Masonry and render were painted in a Dulux Trade system. Sills and entrance joinery, the columns, the balustrade and the railings were finished with the elevation.

A private residential building, named here by street only.

How the exterior work was carried out

Survey, access, repairs and finishing.

The exterior commissions at Inverness Terrace and St George's Square each covered the front and rear of a residential building. The case study records the scope, dates and finished surfaces for this project.

  1. 01

    A defined exterior scope

    Both records cover a full front and rear exterior. The scope includes the building's masonry or render, architectural details and windows.

  2. 02

    Scaffolded access

    The buildings were scaffolded for the exterior work. Mr Wallcover supplies and manages scaffolding as part of the exterior service; the St George's Square record includes its strike in late November 2024.

  3. 03

    Repairs before the finish

    Stucco, masonry and render repairs formed part of these commissions. The individual record identifies the cornices, cracks and other areas made good before the paint finish.

  4. 04

    The architectural details

    The scope extended beyond the flat elevation: cornices, windows and entrance details were included. Balconies and the portico appear in the Inverness Terrace record; columns, balustrade and railings at St George's Square.

  5. 05

    The recorded paint finish

    Dulux Trade finishes are recorded on both projects. The case study describes what was used on that building; it is not a universal paint specification for a different substrate or condition.

  6. 06

    The actual programme

    The dates and photographs belong to the completed commission. Inverness Terrace records return visits in October and December 2018; St George's Square records works from July to November 2024. A new project needs its own scope and programme.

Read about exterior decorating, repairs and scaffolded access

For our wallcovering work: See the finish up close: seams, internal corners, edges and joins from our own installations

By Dorin Burcus, founder · Last updated