Silk
Lustrous, and quick to mark.
Services
Mr Wallcover is a wallpaper installer in London for hotels and prime homes. One practice can take the survey, the management, the supply and the aftercare, or join a package that already has a main contractor, as it did at The OWO.
The smallest commission we take on is a single room. We also take on programmes that run for years; the two shown here each took about two years on site.
Each commission is quoted on its own scope, phasing, crew and start date.
The quotation comes from a site survey or from drawings.
Start your project01 / 05
We measure on site, or from drawings when that is what the programme needs. Skirting, joinery, doors and windows come out of the area. What is left is the wall that will actually be hung.
Quantities include wastage and pattern repeat. The allowance is typically 15–30%, depending on the pattern repeat and the layout, with staircases at the high end (around 30%) because of the angles. A roll that looks generous on a plan can run short on the last pier.
The quantities guide shows how the order is worked out.
The survey is also a judgement on the wall. If it is not ready for the material specified, we say so before anyone orders the last drop.
02 / 05
Every project has a project leader on the ground. That person is the day-to-day contact for the craft, the progress and the expectations that have been set.
On a longer commission, senior oversight checks the quality of the work and agrees a forward plan with you, in person, each week. Frequent and plain communication is part of the method, not a courtesy added at the end.
The team you meet on the first day is the core team that finishes. Disruption is kept low: work is contained, floors and joinery are protected, and the place is left tidy every evening. In a home we are visitors. In a hotel we work around the house.
How we work describes the core team and how it scales for large hotel programmes.
03 / 05
On many hotel and flagship jobs the designer, the brand or the client supplies the wallcovering (free-issue). We manage delivery, check it against the measure, and hang what was specified.
We can also procure. Either way, the order has to cover the repeat and the wastage, or the last wall is the one that waits.
Rolls are inspected as part of preparation; on large volumes not every roll can be opened in advance. Any defect is reported straight away to the designer, contractor and manufacturer.
Delivery is timed to the hang. Paper sitting in a corridor for days is a risk to the goods and a nuisance to the building.
04 / 05
This is the craft Mr Wallcover is built on. Wallcovering installation for hotels, retail flagships and prime residential rooms, including paper on joinery where the drawings show it.
Preparation, where it is in the specification, includes stripping old paper, dustless sanding, and making good cracks and uneven surfaces. Some materials are specified with a lining paper. Some, including certain mural installs, are specified without one. We follow the specification.
We set out every wall with a laser level. Deliveries are checked against the measure, and batches and shading are managed so that a room reads as one surface.
The set-out and pattern matching guide explains the method.
Protection of floors, furniture and finished joinery is part of the hang, not an optional extra. Where Mr Wallcover is appointed as main decorating contractor, the package can include fine painting, French polishing and other specialist finishes, as it did at Brown's Hotel, Mayfair.
Specialist detailing: how we finish an imperfect arch with a bespoke external-corner trim

05 / 05
Aftercare is the fifth part of the service. A return visit is included once the paper has settled, about four to six weeks after completion. Seams and edges are attended to. There is a priority repair call-out for the workmanship, and a twelve-month guarantee.
The detail, including care by material and what the guarantee does not cover, is on the aftercare page.

Materials
Silk, grasscloth, fabric, vinyl, hand-painted papers, murals and acoustic panels are hung by the same team; what changes is the preparation, the set-out and the patience each one needs. These are the materials we hang.

Adam’s Eden by Adam Calkin for Lewis & Wood, photographed with its printed selvedge at Brown’s Hotel, Mayfair. Mr Wallcover project photograph.
Lustrous, and quick to mark.
The irregularity is the point of the material. Colour and weave vary from roll to roll, and the seams are visible. We agree that, and the direction of the weave, before the first length is cut.
Textile on the wall, often in wider goods, with care at the edges and where it meets joinery, skirtings and reveals.
The usual specification in busy hotel rooms and corridors. At The OWO, Whitehall, the install was Vescom, to walls and to parts of the joinery.
Scenic and panelled papers in the manner of de Gournay and Fromental. They need a sound wall, a patient set-out and time. We hang them for London houses and hotels.
Printed and hand-made murals, set out from a fixed point so the scene meets where it should, including around doors and corners.
Acoustic wallcoverings and acoustic panels, hung so the face keeps the performance it was specified for. Adhesive, trimming and edges follow the maker's instruction.
Panel finishes and films
Wallcoverings carried onto doors, wardrobes, panelling and furniture, with bespoke panels created for the chosen finish. Full joinery services can be arranged through our trusted, vetted specialist partners.
Self-adhesive architectural films that refinish doors, joinery, lifts, counters and furniture in place, without stripping out or replacing them.
Films applied to existing glass: frosted and decorative designs, privacy, solar control and safety films for London homes, hotels, offices and shopfronts.
Exteriors
Scaffolding supplied and managed, with masonry and render painting, windows, cornices and railings. The public record is two full exteriors: St George's Square in Pimlico and Inverness Terrace in Bayswater.
Heritage
Wallcovering installation in listed and historic buildings. On the record: Trematon Castle, The OWO, Hyde London City and Four Seasons Ten Trinity Square.
Maker installation
Calico Wallpaper murals and papers installed in London by Mr Wallcover: four public installs since 2018, at Heathrow, Lee Broom, The Lavery and Rosewood London.
House of Hackney wallpapers hung by Mr Wallcover: Trematon Castle, the St Michael's Clergy House showroom, a Hyde London City suite and a North London bedroom.
We install Timorous Beasties papers. On the record: custom-printed vinyl hung through the 111 guest rooms across seven storeys of Hyde London City.
Where we work