Eight months of wallcovering installation at Jumeirah Carlton Tower in Knightsbridge, finished at the end of 2020, during the renovation that reopened the hotel in 2021.
Photograph: Jumeirah Carlton Tower
Project record
Client, materials & project facts
Client
Jumeirah Carlton Tower
Designer
–Not recorded
Main contractor
–Not recorded
Maker and paper
–Not recorded
Area or rooms
–Not recorded
Scope
Wallcovering installation during the hotel's renovation
Year
2020
Jumeirah Carlton Tower stands on Cadogan Place in Knightsbridge, above Sloane Street and the private Cadogan Gardens. We worked on the hotel’s renovation for eight months in 2020, installing wallcoverings, and finished at the end of 2020. The hotel reopened in 2021.
At a glance
Hotel: Jumeirah Carlton Tower, Cadogan Place, Knightsbridge, London
When: 2020, eight months, finished at the end of 2020
Role: wallcovering installation during the hotel’s renovation
The rooms
Jumeirah describes the renovated bedrooms and suites as light oak wall panelling with textured wallcoverings set into the panels, which soften the rooms and give them a more residential feel. Inset work of this kind leaves nowhere to hide: each panel is its own small wall, and every edge meets a moulding or a frame, so the cuts have to be clean and the texture has to run the same way in every panel of a room.
Photographs on this page
We have no photographs of our own from this job that are fit to publish. The photographs here are the hotel’s own: official photographs of the finished rooms and suites, published by Jumeirah on the hotel’s website. Each is credited “Photograph: Jumeirah Carlton Tower”. We did not take them, and they belong to Jumeirah; they are shown to illustrate the finished rooms.
Source for the dates: our Instagram post of 6 January 2021 (see the post): part of the project for 8 months, completed at the end of 2020. The description of the rooms is from Jumeirah’s own fact sheet for the hotel.
Each commission has a written scope by room, walls prepared until they are true, protected floors, batch and shade control, set-out from the room’s focal points, and a return visit. Read the method.
The six standards in full
01
Survey and scope, room by room
We measure the wall that will actually be hung, allow for the repeat and the wastage, and write a scope of works room by room before anyone orders paper.
02
Preparation decides the finish
Walls are filled, made good and primed until they are true. If a wall is not ready for the material specified, we say so before the last drop is ordered.
03
Protection and containment
Floors, furniture and finished joinery are protected as part of the hang. Work is contained and the place is left tidy each evening. In a home we are visitors; in a hotel we work around the house.
04
Batch and shade control
Deliveries are checked against the measure, and batches and shading are managed so that a corridor of rooms reads as one surface.
05
Set out from the room's focal points
Pattern is set out from chimneypieces, doorcases and bed walls, so the pattern sits square to the cornice and the joinery.
06
One team, then the return visit
The people who start are the people who finish. Four to six weeks after completion we come back to look at every seam and edge, and the workmanship is guaranteed for twelve months.