All the internal works plus the full exterior at 9 Langton Street: the showroom and stair hall in Penny Morrison's own papers, then the front elevation.
Project record
Client, materials & project facts
Client
Penny Morrison
Designer
–Not recorded
Main contractor
–Not recorded
Maker and paper
Penny Morrison's own papers
Area or rooms
–Not recorded
Scope
All the internal works plus the full exterior
Year
2023–2024
At a glance
Client: Penny Morrison, at The Fabric Collective
Address: 9 Langton Street, Chelsea, London SW10
Internal works: December 2023 to January 2024
Exterior: April to May 2024
Scope: all the internal works plus the full exterior
Inside
The showroom and the stair hall were decorated and papered in Penny Morrison’s own floral papers. Joinery and electrics were coordinated with the decorating so the rooms could be finished as one interior.
Outside
The full front elevation followed in April and May 2024: windows, stucco and brick, and the entrance. The same commission covers the interior and the exterior.
Photographs
One more photograph from this project
How the commission ran
The same standards, on every commission.
Each commission has a written scope by room, walls prepared until they are true, protected floors, batch and shade control, set-out from the room’s focal points, and a return visit. Read the method.
The six standards in full
01
Survey and scope, room by room
We measure the wall that will actually be hung, allow for the repeat and the wastage, and write a scope of works room by room before anyone orders paper.
02
Preparation decides the finish
Walls are filled, made good and primed until they are true. If a wall is not ready for the material specified, we say so before the last drop is ordered.
03
Protection and containment
Floors, furniture and finished joinery are protected as part of the hang. Work is contained and the place is left tidy each evening. In a home we are visitors; in a hotel we work around the house.
04
Batch and shade control
Deliveries are checked against the measure, and batches and shading are managed so that a corridor of rooms reads as one surface.
05
Set out from the room's focal points
Pattern is set out from chimneypieces, doorcases and bed walls, so the pattern sits square to the cornice and the joinery.
06
One team, then the return visit
The people who start are the people who finish. Four to six weeks after completion we come back to look at every seam and edge, and the workmanship is guaranteed for twelve months.