Hotels & operators
Hotel packages that work around your guests.
A guest room, a corridor and a reception area have different demands. Plan the finish around how each space is used, how it is maintained and when it can be released for work.

01
Plan around occupation
Identify which rooms can be released together, permitted working hours and the routes used for deliveries. Include guest access, protection and daily handover expectations.
02
Choose for the actual use
Agree appearance and maintenance requirements together. Confirm the exact cleaning instructions and the project performance documents for each proposed product.
03
Keep a usable record
A room-by-room record of the installed product, batch and care information helps future maintenance. Discuss spare material and the limits of matching a later repair before handover.
Hotel groups on our record
Hotels from these groups where we have installed, each linked to its case study. Naming a group records an installation, not an endorsement.
Hilton
Hilton Garden Inn Silverstone · Hilton London Metropole · DoubleTree by Hilton London – West End · DoubleTree by Hilton London – Victoria
Four Seasons
Jumeirah
Ennismore
Raffles (Accor)
Rocco Forte Hotels
Questions
Questions buyers ask
Which London hotels has Mr Wallcover worked on?
There are 22 named hotels on the public record:
- Brown's Hotel, Mayfair (main decorating contractor, 2022–2024, Rocco Forte Hotels)
- Hyde London City, 15 Old Bailey (full decorating package, specialist wallcoverings and window film, 111 rooms, sample room November 2022 to August 2024)
- Raffles London at The OWO (wallcovering installation, 2020–2023)
- Four Seasons Hotel London at Ten Trinity Square, now at Tower Bridge (guest room and suite wallpapering, 2016–2019)
- DoubleTree by Hilton London – West End (2019)
- DoubleTree by Hilton London – Victoria (March to September 2023)
- Hilton Garden Inn Silverstone (main wallcoverings contractor, 2022)
- The Biltmore Mayfair (2018, including Phillip Jeffries)
- Pendley Manor Hotel (December 2019 – January 2020)
- Hilton London Metropole, Paddington (2019)
- Novotel London Canary Wharf (2016)
- Jumeirah Carlton Tower, Knightsbridge (2020)
- Waldorf Astoria London Admiralty Arch (2026)
- London Marriott Hotel Canary Wharf (2026)
- Heythrop Park, Oxfordshire (2022)
- The Westminster London, Curio Collection by Hilton (2021)
- The Marylebone (2020)
- The Lensbury, Teddington (2018–2019)
- Hilton London Hyde Park (2016)
- Premier Inn London Heathrow Airport Terminal 4 (2016)
The Lanesborough and Moxy London ExCeL are listed by name only.
Can you work nights or out of hours?
Out-of-hours work is on the published record. At Heathrow Terminal 4, a bespoke Calico Wallpaper mural was hung overnight on 24–25 September 2018 in a live terminal, and the finished walls were photographed between 02:30 and 03:42. In an occupied hotel, the permitted working hours, delivery routes, guest routes and daily handover are agreed for each project and written into the scope. Most of the hotel work on record was done in buildings that stayed open. Night shifts, out-of-hours and weekend work are offered, including in live hotels.
Do you install Class A / B-s1,d0 fire-rated wallcoverings, and can you evidence it?
Mr Wallcover does not call a wallcovering fire-rated unless that product's own data says so. A fire classification, such as a Euroclass under EN 13501-1, belongs to the build-up that was tested: the wallcovering, the adhesive and the substrate together. "Class A" on its own is not a class name under EN 13501-1: it may refer to a US ASTM E84 result, which is not a European class, or be loose shorthand for European class A1 or A2, so ask for the full classification, such as B-s1,d0. A substitute product or adhesive needs its own evidence. For a hotel, get the current classification document for the exact product, backing and installation method. For building work, the responsible designer, fire engineer or building-control body accepts it. Where the work is not building work, the hotel's responsible person accepts it, through the fire risk assessment. A guest room, a public corridor and a protected stair can have different requirements, and no single class is what "hotels need". The adhesive and primer are part of the specified system and are used as the maker lists them (Vescom, for example, lists them per product). The fire classification is not certified by the installer: it comes from testing and classification of the product in a stated build-up, and the wallcovering manufacturer declares it. Mr Wallcover installs to the wallcovering maker's instructions and the project's fire specification.
Have you installed contract vinyl in hotels?
Yes. At Raffles London at The OWO (2020–2023), Mr Wallcover installed a bespoke Vescom wallcovering made for the hotel, on walls and parts of the joinery, with Vescom Alcantara in selected suites. At Hyde London City (2022–2024), Timorous Beasties' Tropical Clouded Leopard and Totem Damask were installed as custom-printed vinyl in the guest rooms. (The site doesn't publish a vinyl "Type" grade for either, so none is claimed.)
How large a hotel programme can you run, and how long does it take?
These are the hotel programmes on record. Hyde London City: 111 rooms plus corridors and stair cores, from a finished sample room in November 2022 to final touches in August 2024, ahead of the opening on 2 September 2024. Raffles London at The OWO: bedrooms and several other areas, 2020–2023. Four Seasons Ten Trinity Square: guest rooms and suites, 2016–2019, through the 2017 opening. DoubleTree by Hilton London – Victoria: guest rooms, March to September 2023. Every project has a project leader on the ground, and the team that starts is the core team that finishes. The core team is six wallpaper hangers and six decorators, scaling to 25–35 people on large projects. At Hyde London City there were 25 people on site, in coordinated task teams covering preparation, filling, sanding, painting and hanging.
How is snagging handled?
Snagging is part of the package. A sample room or sample area is agreed first, in the permanent lighting where possible, and every later room is measured against it. Then comes the hang, then snagging, then a return visit about four to six weeks after completion, at no call-out charge, when seams, edges and corners are checked once the paper has settled. Visible seams and shading in natural weaves are properties of the material, and they are settled at the sample stage rather than raised as snags. At Hyde London City the record starts with a finished sample room in November 2022.
What accreditations or training do you hold?
Mr Wallcover trained at Solar Screen's headquarters in Luxembourg in window films (Solar Screen) and in architectural and furniture wrapping film (Cover Styl'), and installs both to the maker's own instructions. Site card and accreditation details are available on request.
What insurance do you hold?
Public liability, employers' liability and professional indemnity details are available on request.
Do you issue RAMS, and who supervises the site?
Risk assessments and method statements (RAMS) are issued for every package, and Dorin Burcus personally supervises the site.
Do you install acoustic wallcoverings and panels?
Acoustic wallcovering and acoustic panel installation in London hotels, offices and homes. Hung to the maker's instruction so the face keeps its performance.
What aftercare and guarantee are included?
Aftercare is part of every commission: a return visit about four to six weeks after completion, a priority repair call-out and a twelve-month workmanship guarantee.
How long have you been in the trade?
Dorin Burcus, founder of Mr Wallcover, has worked in the trade since 2012. Award-winning (2021): Most Outstanding for Wallcovering Installation, BUILD Magazine 2021 Design & Build Awards.
Have you worked in listed buildings?
Listed buildings on the published record: Hyde London City (Grade II, 1874); Four Seasons Ten Trinity Square (Grade II*); a Grade II-listed Georgian house in North London. We follow the specification and whatever the consents for the building allow.